So, the order for 2 analog lines has been accepted by BT. These lines were ordered at the same time going to the same building.
Now the best bit. BT have given an install time on one line for Friday 7th November between 8am and 1pm and the second line between 1pm and 6pm. Now anyone in their right mind would think hang on, an engineer could install both these lines at the same time.
I’m hoping the the BT engineer is the same for each install and will see the error in BT’s plan. We shall see.